Search results “Oracle primavera update”
How to Update Progress in Primavera P6
 
04:53
Learn to update progress of your project using Primavera p6
Views: 34320 Construction Techie
5 Minutes with Primavera P6 Professional - Updating Activities Using Auto Compute Actuals
 
03:28
Status your project automatically with the use of auto compute actuals. This function will automatically update actual dates, percent complete, remaining duration and remaining units based on the data date. The video is part of the 5 Minutes with Primavera P6 Professional series, developed by the Oracle Primavera Curriculum Team to demonstrate, explain, and enhance your experience with the application. Click the CC icon to display subtitles; click the Settings icon to change subtitle language. Useful links: Send feedback, comments, questions: [email protected] View more Oracle Learning Library videos: https://www.youtube.com/user/OracleLearning/playlists View additional Oracle Primavera training content: http://www.oracle.com/oll/primavera ================================= For more information, see http://www.oracle.com/goto/oll Copyright © 2015 Oracle and/or its affiliates. Oracle is a registered trademark of Oracle and/or its affiliates. All rights reserved. Other names may be registered trademarks of their respective owners. Oracle disclaims any warranties or representations as to the accuracy or completeness of this recording, demonstration, and/or written materials (the “Materials”). The Materials are provided “as is” without any warranty of any kind, either express or implied, including without limitation warranties or merchantability, fitness for a particular purpose, and non-infringement.
Oracle Primavera P6 Update Project Tech Tip
 
07:53
Learn how to use the maintain baselines feature in Oracle Primavera P6 for updating projects. For pricing on software licenses, training, and hosting visit: http://www.drmcnatty.com/
Views: 14319 drm318stony
5 Minutes with Primavera P6 - Updating Tasks in P6 Mobile
 
05:41
Explore the task update features in the P6 mobile application, available on iOS and Android devices. Filter tasks, update your progress, view task location and directions, and graphically edit photos to add context to a task. The video is part of the 5 Minutes with Primavera P6 series, developed by the Oracle Primavera Curriculum Team to demonstrate, explain, and enhance your experience with the application. Click the CC icon to display subtitles; click the Settings icon to change subtitle language. Useful links: Send feedback, comments, questions: [email protected] View more Oracle Learning Library videos: https://www.youtube.com/user/OracleLearning/playlists View additional Oracle Primavera training content: http://www.oracle.com/oll/primavera Copyright © 2015 Oracle and/or its affiliates. Oracle® is a registered trademark of Oracle and/or its affiliates. All rights reserved. Oracle disclaims any warranties or representations as to the accuracy or completeness of this recording, demonstration, and/or written materials (the "Materials"). The Materials are provided "as is" without any warranty of any kind, either express or implied, including without limitation warranties of merchantability, fitness for a particular purpose, and non-infringement. ================================= For more information, see http://www.oracle.com/goto/oll
P6 Oracle Primavera - Apply Actuals
 
17:01
How to apply actual dates, resource hours and expenses to your P6 schedule.
Views: 4817 Schedule Guy
Lecture 9 Progress Update in Oracle Primavera P6 Professional Ver.18.8
 
17:59
Lecture 9 Progress Update in Oracle Primavera P6 Professional Ver.18.8 Updating the project schedule Update the schedule regularly and compare it to the baseline to ensure that resources are being used effectively, project costs are being monitored against the original budget, that there is a knowledge of actual durations and costs in order to initiate contingency plans if necessary. Ask the following questions when updating: · What information needs to be collected to update the project and what method(s) will be used to collect information? · Who will gather the necessary information used for the project update? · How often should the project be updated? · Are resources local or offsite? · Who will need to see the results of the update and when are these results needed? · What types of information will be generated after each update in order to communicate progress before the next update period?
Primavera P6 17.7 Download and Install (New Version)
 
10:04
Subscribe please ---------------------------- ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ FaceBook Acc :https://www.facebook.com/final.second... FaceBook Page : https://www.facebook.com/FS-Learn-821... ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ Primavera P6 17.7 Download and Install https://edelivery.oracle.com/osdc/faces/Home.jspx In this video I will show you how to download an install P6 17.7 Professional on SQLite database, on windows 10 Help Us Like & Share This Video. Don't forget to Subscribe & comment below. Thanks! Primavera P6 Primavera P6 17 Primavera P6 17.7 Download Primavera P6 Download Primavera P6 Learn
Views: 54991 FS Learn
Oracle Primavera Professional экспресс-установка
 
05:37
http://pminstitute.ru/ Получи БЕСПЛАТНЫЙ онлайн-курс по управлению проектами ↓↓↓ http://pminstitute.ru/ Подпишись на канал ➞ https://www.youtube.com/channel/UCcc6M3QpNeIcXYR0iJT5fJQ?sub_confirmation=1 Пошаговая инструкция по установке Oracle Primavera Professional www.sofonov.ru - тренинги Oracle Primavera Professional
Primavera P6 R8.3 - Primary Level (18/19 - Progress Update)
 
12:32
لرؤية افضل .. يمكن ضبط الجودة على 720 من ترس الاعدادات في الشريط اسفل الفيديو Primavera P6 Tutorial تعليم بريمافيرا
Views: 15377 Mohamed ElSaadany
Primavera P6 Weekly updates, baselines, and variances.
 
09:07
Demo on setting up a layout to show weekly baselines and weekly variances - via user defined fields and global change. How a change in admin settings effects these weekly baselines and variances.
Views: 49302 indiana1917
Primavera P6 Tutorial: Subcontractor Updates using Reflections
 
13:29
This Plan Academy video tutorial shows you how to process updates from multiple subcontractors using Reflection projects in Oracle Primavera P6. For more tutorials and Primavera P6 training resources, please visit: http://www.plannacademy.com
Views: 5128 Plan Academy Inc.
How to update Baseline in Primavera P6 || Primavera Scheduling || dptutorials
 
05:58
How to update Baseline in Primavera P6 || Primavera Scheduling || dptutorials As per the schedule management philosophy, schedule has to be baselined once it has been agreed by all the stakeholders. Baseline is something that we usually do not change. But in some cases, we require to change it. In this video tutorial, let us see how we can update baseline in Primavera P6. Let us consider a simple project which is having an assigned baseline. After some weeks, after updating schedule, the project is delayed from the baseline After discussing with stakeholder and specific owner, we need to get the permission to update our baseline so as to make it identical to the current schedule. In this tutorial, we will see two ways to update baseline. Method 1: We need to copy paste our current schedule to make as a new baseline B2 and assign the new baseline to our project. Before that, we need to make an important configuration. Go to menu Admin, select Admin Preferences. In Earned Value tab, select “At completion values with current dates” Go to menu bar, under Project, select Maintain Baselines. Click Add to create a new baseline Go to menu bar under Project, select Assign Baselines. Select baseline B2 Now you can see the baseline have been updated aligning with the current schedule. Method 2 : Restore baseline Go to menu bar, under Project, select Assign Baselines. Select Current project Go to menu bar, under Project, select Maintain Baselines. Select the baseline and click on Restore button Now go to the Project window and we can see the baseline become a separate project which we should open and update as per the changes. After finishing the updating of the baseline project, you need to again assign it as a new baseline. Open your “main” project. Go to menu bar and under Project, select Maintain Baselines. Click on Add button. Now we will select option “Convert another project” and select the updated baseline project. Go to menu bar, under Project, select Assign Baselines. And choose the latest updated baseline. Now your project will have a new baseline as per your wish aligning with the current schedule. For Personalized detail learning, write to [email protected] If you found this video valuable, give it a like. If you know someone who needs to see it, share it. Leave a comment below with your thoughts. Add it to a playlist if you want to watch it later. *********************************************** Read my full article on this: www.dptutorials.com Subscribe for more Awesome Tutorials: goo.gl/NyAtg2 Support The Channel via shopping: http://ift.tt/2jH38PR *********************************************** You Can Connect With Me at Youtube : www.youtube.com/c/dptutorials G+ : http://ift.tt/2kAOpa6 Twitter : https://twitter.com/dptutorials15 Facebook : http://ift.tt/2kfRnDi Blogspot : http://ift.tt/2kB14dh
Views: 4234 dptutorials
Oracle's Primavera P6 Team Member Mobile App Demo
 
02:18
Discover how the simple mobile app interface allows for quick status updates so a project schedule remains accurate and timely
Learn Oracle Primavera P6 EPPM R8 in 10 Mins
 
10:00
Affordable P6 EPPM Virtual Training: http://bit.ly/14gPlUr More infor at: http://www.volantic.com Learn Oracle Primavera P6 EPPM R8 in 10 minutes!! For more information on Oracle Primavera applications and consulting services visit:
Views: 279608 VolanticInc
How To Use Team Member To Update Primavera P6 Schedule?
 
15:29
Step by step How To Use Team Member To Update Primavera P6 Schedule?
Views: 1681 ZAlbasir EPPM
Primavera P6 Tutorial : Chapter - 4.4 : Updating, Scheduling Project - With Spotlight Feature
 
04:11
This Tutorial will show you how to update your schedule and in particular let us learn the method of using the spotlight feature as part of this video tutorial.In the next tutorial we will be discussing in detail with other methods of updating If you found this video valuable, give it a like. If you know someone who needs to see it, share it. Leave a comment below with your thoughts. Add it to a playlist if you want to watch it later. *************************************************************** Read my full article on this: http://askplanner.blogspot.in *************************************************************** Subscribe for more Awesome Tutorials: goo.gl/4T8ePc *************************************************************** Support The Channel via shopping: http://www.flipkart.com/offers/electronics?affid=durgapras20 *************************************************************** You Can Connect With Me at G+ : https://plus.google.com/b/112911032303346458261/+AskplannerBlogspotLearningmadeeasy Twitter : https://twitter.com/dptutorials15 Facebook : https://www.facebook.com/Dptutorials-907074799403378/?ref=aymt_homepage_panel Blogspot : http://askplanner.blogspot.in Tags: primavera project planner software primavera project planner primavera scheduling primavera suretrack primavera address primavera website primavera project planner p3
Views: 9064 dptutorials
Lecture 6 Oracle Primavera P6. Ver.18–Create-Baselines
 
09:38
Create Baseline The Baseline or Target Schedule provides a point of reference on which to measure and control the underway project. Create a Baseline copy of the schedule before the first update. This will be the target against which the project’s cost, schedule, and performance are tracked. Assign each baseline a category to define its purpose (i.e. initial planning baseline, what-if project plan baseline, mid-project status baseline, monthly update comparison baseline). Categories are created under the Admin menu, Admin Categories, Baseline Types.
5 Minutes with Primavera P6 - Updating Timesheets in P6 Mobile
 
04:06
Explore timesheet functionality in the P6 mobile application, available on iOS and Android devices. View overdue timesheets, update hours, set timesheet reminders, and submit timesheets for approval. The video is part of the 5 Minutes with Primavera P6 series, developed by the Oracle Primavera Curriculum Team to demonstrate, explain, and enhance your experience with the application. Click the CC icon to display subtitles; click the Settings icon to change subtitle language. Useful links: Send feedback, comments, questions: [email protected] View more Oracle Learning Library videos: https://www.youtube.com/user/OracleLearning/playlists View additional Oracle Primavera training content: http://www.oracle.com/oll/primavera ================================= For more information, see http://www.oracle.com/goto/oll Copyright © 2016 Oracle and/or its affiliates. Oracle is a registered trademark of Oracle and/or its affiliates. All rights reserved. Other names may be registered trademarks of their respective owners. Oracle disclaims any warranties or representations as to the accuracy or completeness of this recording, demonstration, and/or written materials (the “Materials”). The Materials are provided “as is” without any warranty of any kind, either express or implied, including without limitation warranties or merchantability, fitness for a particular purpose, and non-infringement.
Primavera P6 Percent Complete Types
 
05:51
This video shows you how to status activities using both Physical Percent Complete and Duration Percent Complete type activities. Learn more by visiting https://tensix.com
Views: 70039 Ten Six
Resource Loading or Cost Loading in Oracle Primavera P6
 
13:03
If you able to understand Oracle Primavera P6 Video tutorials, then please login to www.tutomaash.com to learn more topics for support contact our trainer +91 9961654525
5-Fifth Live Class on Facebook for Free Courses in Oracle Primavera P6, Ver,18– Create-Baselines
 
24:47
Create Baseline The Baseline or Target Schedule provides a point of reference on which to measure and control the underway project. Create a Baseline copy of the schedule before the first update. This will be the target against which the project’s cost, schedule, and performance are tracked. Assign each baseline a category to define its purpose (i.e. initial planning baseline, what-if project plan baseline, mid-project status baseline, monthly update comparison baseline). Categories are created under the Admin menu, Admin Categories, Baseline Types.
Primavera P6 Team Member (Web Application)
 
02:23
A walk-through of the new Oracle Primavera P6 R8.2 Team Member web. This application offers a great way to collect progress from team members and have them, through an approval process, update project plans in Primavera P6 EPPM. Get more tips from our Blog https://tensix.com/blog
Views: 14768 Ten Six
Primavera P6 Tutorial: Importing Primavera Updates from an Excel Spreadsheet
 
14:01
(WATCH IN 720p) Using real world projects and scenarios, this tutorial will show you step-by-step how to import updates to a Primavera P5 or P6 plan from an excel spreadsheet. If you work with subcontractors who submit updates, learn to streamline the updating process. For more tutorials and Primavera P6 training resources, please visit: http://www.planacademy.com
Views: 43409 Plan Academy Inc.
Import Activities Relationships from Excel to Primavera P6
 
04:14
Imagine if we can combine the power of excel with oracle primavera? This is sample of the expected results, importing thousands of activities relationships in few minutes. We have even much more in our Professional Planning Engineer (PPE) online workshop. Join our next PPE workshop and learn how to do Planning faster and more professional. https://www.planningengineer.net/courses/professional-planning-engineer-ppe-online-workshop/ Did you like this Video? Join us in Planning Engineer Website where we have specialized training courses for planning and scheduling. courses link: http://bit.ly/2yVJ3z2
Views: 7630 Planning Engineer
Learning Bites S02E03 - Primavera Team Member Project Updates (Primavera P6 EPPM)
 
04:13
A micro video tutorial guiding you through the project update process in Oracle Primavera Team Member. - Find an Oracle classroom training course: http://bit.ly/1EysAwi - Find a Primavera P6 eLearning course: http://bit.ly/1MwTQPT - Buy or upgrade Oracle licenses: http://bit.ly/1ZLirq0 ABOUT US: Prescience Technology is an Oracle Primavera Specialized Platinum Partner, an Oracle University Authorized Reseller and an Oracle Authorized Education Centre. We are the leading provider of Primavera P6 classroom training and eLearning in Australia.
Oracle Primavera P6- Live Training Session 1
 
42:53
If you able to understand Oracle Primavera P6 Video tutorials, then please login to www.tutomaash.com to learn more topics for support contact our trainer +91 9961654525
Primavera P6 updating baseline
 
00:40
for a full list of topics for "Primavera P6 Enterprise Project Portfolio Management Implementation Specialist" see the link below: http://oracleprimaverap6.blogspot.se/
Views: 6923 Lernogram
Primavera P6 Professional Progress activities using Steps
 
09:19
There are a number of features that are unique to Oracle Primavera P6 and are so useful, it's a wonder other vendors like Microsoft haven't copied the ideas. In this case we're looking at a feature called Activity Steps. Learn more at https://tensix.com/training
Views: 20187 Ten Six
Primavera P6 Learning Bite 7 - Update Using Reflection Projects (Professional Client)
 
03:19
A micro video tutorial showing you how to update your project using a cloned reflection project in Oracle Primavera P6 (Professional Client). - Find a P6 classroom training course: http://bit.ly/1EysAwi - Find a P6 eLearning course: http://bit.ly/1MwTQPT - Buy or upgrade P6 licenses: http://bit.ly/1ZLirq0 ABOUT US: Prescience Technology is an Oracle Primavera Specialized Platinum Partner. We are the leading provider of Primavera P6 classroom training and eLearning in Australia.
Views: 1262 Prescience Technology
Update Progress - Primavera P6
 
02:57
Introducing the Primavera add-on program for Oracle Primavera P6 Schedules. The Primaver add-on program allows you to quickly and easily upload your schedule data. It also makes it easy to create, update, and view schedule data, such as projects, wbs, activities, resources, activity codes, assignments, calendars, udf, etc. and helps improve productivity by reducing the time required for initial project preparation and update.
Views: 219 Ex-Bridge
Managing Baselines in Primavera P6
 
10:21
Primavera P6 Professional allows you to assign up to three user baselines and one project baseline per project. Here we take a look at these. Learn More at https://tensix.com
Views: 44037 Ten Six
Primavera P6 for Project Managers(Video#7)Project tracking & control-Activity Update Progress Actual
 
11:30
This is the seventh video in the series on Primavera P6 training and shows how to update activity progress, define and enter actuals. The best practice in defining auto compute actuals for non-labour (material) resources is also explained.
5 Minutes with Instantis EnterpriseTrack - Updating Activities
 
03:41
This video covers an alternate method for updating activities in Instantis EnterpriseTrack that may save you time and effort. The video is part of the 5 Minutes with Primavera Instantis EnterpriseTrack series, developed by the Oracle Primavera Curriculum Team to demonstrate, explain, and enhance your experience with the application. Click the CC icon to display subtitles; click the Settings icon to change subtitle language. Useful links: Send feedback, comments, questions: [email protected] View more Oracle Learning Library videos: https://www.youtube.com/user/OracleLearning/playlists View additional Oracle Primavera training content: http://www.oracle.com/oll/primavera Copyright © 2015 Oracle and/or its affiliates. Oracle is a registered trademark of Oracle and/or its affiliates. All rights reserved. Other names may be registered trademarks of their respective owners. Oracle disclaims any warranties or representations as to the accuracy or completeness of this recording, demonstration, and/or written materials (the “Materials”). The Materials are provided “as is” without any warranty of any kind, either express or implied, including without limitation warranties or merchantability, fitness for a particular purpose, and non-infringement.
PPM P6 - 14 Updating project progress (Schedule)
 
03:40
In this video you will learn how to Updating project progress (Schedule). CivilMDC.com is an Online learning platform, offers educational training courses in the fields of Designing, software, technology and creative skills. The company, through its instructional video tutorials, offers courses in the areas of CAD, design, Analysis,Civil Engineering education, Planning and many more e-learning courses. To Build a relationship, Please CLICK THE SUBSCRIBE BUTTON.. ************************************************** Download Link for Software (Latest) https://www.civilmdc.com/index.php/Home/single_post/529/1 ************************************************** If you face any difficulty...... Feel free to contact. Contact Details www.civilmdc.com Professional Trainers Email ID: [email protected] #Primavera #P6 #Training
Views: 906 M Hussain
Updating Primavera Schedules with Spreadsheets
 
10:42
Bill Pepoon, Managing Partner of Construction Science, demonstrates how to update any Primavera schedule (Contractor or P6) using a Microsoft Excel spreadsheet.
Views: 17916 Bill Pepoon
Primavera P6 Tutorial : Chapter - 4.4.2 : Updating Project by Manual Method |Primavera | dptutorials
 
03:07
Primavera P6 Tutorial : Chapter - 4.4.2 : Updating Project by Manual Method is clearly explained in this video tutorial. You can save time by following these simple steps in updating the project schedule. If you found this video valuable, give it a like. If you know someone who needs to see it, share it. Leave a comment below with your thoughts. Add it to a playlist if you want to watch it later. *************************************************************** Read my full article on this: http://askplanner.blogspot.in *************************************************************** Subscribe for more Awesome Tutorials: goo.gl/4T8ePc *************************************************************** Support The Channel via shopping: http://www.flipkart.com/offers/electronics?affid=durgapras20 *************************************************************** You Can Connect With Me at G+ : https://plus.google.com/b/112911032303346458261/+AskplannerBlogspotLearningmadeeasy Twitter : https://twitter.com/dptutorials15 Facebook : https://www.facebook.com/Dptutorials-907074799403378/?ref=aymt_homepage_panel Blogspot : http://askplanner.blogspot.in Tags: p3 scheduling software primavera software training pdf primavera pm software primavera suretrak project manager p6 scheduling software cost primavera project management system primavera p6 16.1 construction scheduling software primavera primavera p6 professional project management software free download p6 scheduling software primavera contract manager how to create wbs in primavera p6 primavera p6 layouts download primavera p6 documentation primavera for project management cost loading in p6 primavera p6 resources primavera scheduling software primavera p6 scheduling software primavera project software primavera p6 reviews primavera construction software primavera project planning primavera scheduling software cost p6 software primavera planning tool primavera p6 project management primavera p6 features primavera software primavera systems construction scheduling training primavera software tutorial primavera construction benefits of primavera p6 primavera for dummies pdf primavera p6 tutorial pdf free download primavera sample project primavera scheduling primavera p6 scheduling primavera planning primavera p3 primavera project management how to use primavera p6 learn primavera p6 project planning and scheduling using primavera p6 pdf primavera p6 8.2 tutorial pdf primavera scheduling software free download p6 planning software primavera project planner primavera p6 training primavera programme
Views: 4270 dptutorials
TAPS v8 - Primavera P6 Barcode Updating
 
10:18
https://www.emerald-associates.com/taps-turnaround-progressing-system.html --- Our website: https://www.emerald-associates.com Our LinkedIn: https://www.linkedin.com/company/81377?trk=tyah&trkInfo=clickedVertical%3Acompany%2Cidx%3A2-1-6%2CtarId%3A1432914893132%2Ctas%3Aemerald%20ass --- TAPS uses barcode scanning technology to eliminate the need for manual data entry when updating your Oracle Primavera P6 schedules. Simply use a barcode scanner to find, start and update any activity within the schedule in two fast scans. Innovative features of this release include new updating options that give users the ability to update P6 activities with all the percent complete types available in Primavera P6. There are also new ways to calculate resource assignment Earned Value.
Views: 552 EAI Emerald
Update Primavera P6 % Complete
 
03:40
http://www.harddollar.com - Update the physical percent complete captured in HD PCM to Primavera P6 automatically with a single click.
Views: 11376 Hard Dollar
Primavera P6: Baselines Explained
 
18:33
Bill Pepoon, Managing Partner at Construction Science and Primavera Scheduling, explains the proper way to create baselines in Primavera P6. In our experience the vast majority of P6 users are not using baselines correctly. In less than 20 minutes you can become an expert at creating P6 baselines! Note: this video replaces a similar one posted a few days ago. The earlier video captured a pop-up window that was not intended to be shown. Sorry about that.
Views: 107226 Bill Pepoon
Duration, Physical & Unit Percent complete in Primavera P6 - PART 2 | TUTOMAASH.COM
 
04:27
If you able to understand Oracle Primavera P6 Video tutorials, then please login to www.tutomaash.com to learn more topics for support contact our trainer +91 9961654525
Free Download Primavera P6 Professional V16.2 2017  Genuine & Legal (No Crack/Patch)
 
07:12
Watch the video to know how to legally download a copy of Primavera P6 latest full version.
Views: 60630 Construction Techie
Using Oracle's Primavera Risk Analysis for P6 Turnaround Projects
 
32:17
Thank you for viewing are video! This video is over "Using Oracle's Primavera Risk Analysis for P6 Turnaround Projects". We would love to hear your feedback or any questions you have.
Views: 807 TEPCOLLC
How To Use Expected Finish Date Feature In Primavera P6 || How To Apply Deadlines To Your Project
 
03:36
In this tutorial, let us learn How to use the Expected Finish Date feature in Primavera P6 or How To Apply Deadlines To Your Project This is the sample schedule. If you go to the Status tab in the activity details, you can see the expected finish field below the Finish date. So what is this expected finish date and how do we use it? Now, go to the scheduling option and find that the "Use Expected Finish Dates" option is switched on to enable the Expected finish date act as a constraint. You should be using the expected finish constraint when you do not know the duration but sure about the finish date. so, when this constraint is applied, every time you schedule the project, the P6 will calculate the new remaining duration based on the expected finish date constraint. For example, in this sample schedule. For Activity C, let us set the Expected finish date as 30th Apr'19. Now, while updating the project, you will update the finish date of Activity A by 6 days delay. i.e 15th Apr'19 And when you schedule the project with data date as 15th Apr'19, you will notice that the duration reduces from 9 to 6 days and your finish date is locked as per the expected finish date i.e., 30th Apr'19. You may get a doubt that then what is the difference between the Expected finish date and the normal constraint feature. If you use the constraint like mandatory finish with the same date as 30th Apr'19 for Activity C and schedule the project, you can see the duration unchanged, which is wrong. So, friends this Expected finish date feature would be very useful when you are unsure about the duration and you know the expected finish dates from the vendors on the long lead deliveries. It would be very easy for us to update the project based on the readily available dates. So, friends, this is all about this Expected finish date feature in Primavera P6. If you have enjoyed this tutorial, please give me a like, share and comment. For further more interesting videos, please do subscribe dptutorials For Personalized detail learning, write to [email protected] If you found this video valuable, give it a like. If you know someone who needs to see it, share it. Leave a comment below with your thoughts. Add it to a playlist if you want to watch it later. *********************************************** ★ My Online Tutorials ► https://www.dptutorials.com LEARNING RESOURCES I Recommend: https://www.dptutorials.com/resources Subscribe for more Awesome Tutorials: goo.gl/NyAtg2 Support the Channel via shopping: http://ift.tt/2jH38PR Tools that I use for Vlogging: • Laptop: https://amzn.to/2E5U3MO • Microphone: https://amzn.to/2VwZyPn • 2nd Microphone: https://amzn.to/2JAK1qt • Screen recorder: https://www.techsmith.com/store/camtasia • Camera: https://amzn.to/2HglDYA • Wireless Mouse: https://amzn.to/2E23cpN Note: This description contains affiliate links, which means at no additional cost to you, we will receive a small commission if you make a purchase using the links. This helps support the channel and allows us to continue to make videos like this. Thank you for your support! *********************************************** You Can Connect with Me at YouTube: www.youtube.com/c/dptutorials G+: http://ift.tt/2kAOpa6 Twitter: https://twitter.com/dptutorials15 Facebook: http://ift.tt/2kfRnDi BlogSpot: http://ift.tt/2kB14dh Follow: www.dptutorials.com www.askplanner.blogspot.com Tags: - P6: primavera p6 training online, primavera p6, primavera p6 training, primavera p6 tutorial, oracle primavera, primavera p6 download, primavera 6, oracle primavera p6, primavera p6 free download, primavera project management, primavera project planner, primavera download, primavera online, primavera training, primavera software free download, youtube primavera, primavera tutorial, is primavera online easy, p6 online, primavera p6 complete video tutorial free download, critical path, oracle primavera, primavera p6, primavera, primavera software, construction project management software, project management software, project management books, microsoft project, project management courses, project management certification, online project management, project management tools, free project management software, project management training, best project management software, pmp certification, free project management tools, project management apps, microsoft project management, project management professional certification, google project management, ms project, agile project management, basecamp project management, project portfolio management, project management, project management system, scrum project management, open source project management, project management template, construction project management, project plan, project management professional, free project management, it project manager, project manager jobs, project management excel, project management consultant
Views: 275 dptutorials
Primavera P6 Tutorial : Chapter - 4.3 : Updating Baselines || Baseline | Primavera P6 || dptutorials
 
02:25
FOR MORE DETAILED TUTORIALS, VISIT http://dptutorials.in/ SUBSCRIBE FOR MORE AWESOME TUTORIALS https://www.youtube.com/user/dpiitm SUPPORT THE CHANNEL VIA SHOPPING http://www.amazon.in/gift-card-store/b?ie=UTF8&node=3704982031 http://www.flipkart.com/offers/electronics?affid=durgapras20
Views: 2653 dptutorials